• TAMC Cone Zone Report

    Here are the major scheduled road and lane closures for Monterey County from Sunday, September 28, through Sunday, October 5, 2014Please keep in mind that construction work is weather-dependent.

    Highway 1 – Carmel: September 29 – October 3

    • Daytime paving along southbound Highway 1 between Monastery Beach and Point Lobos from 9 a.m. to 3 p.m.
    • There will be one way reversing traffic control with flaggers.
    • Motorists can expect delays of approximately 10 minutes

    Highway 68 – Monterey: September 28 – October 3

    • Night time utility work along eastbound and westbound Highway 68 at Olmsted Road from 7 p.m. to 6 a.m.
    • Motorists can expect delays of approximately 5 minutes

    posted to Cedar Street Times on September 26, 2014

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.

  •  


  • 416 Fountain Av, Pacific Grove

    This charming two-bedroom, two-bath 1325ft2 Victorian built in 1905 has a historical plaque. It has been thoroughly renewed with lovely wide plank original floors freshly refinished. A living room with high ceilings and bay windows, fireplace with mantel and gas logs, formal dining room, kitchen with gas stove, d/w, disposal, pantry cabinet, French doors opening to enclosed back paver courtyard, lockable walk-in and bike access gate. New tankless hot water heater. New laminated wood floors in kitchen, baths and laundry. Renovated attic bonus room with skylights and closet adds about 350 usable sq ft. Ocean view from front yard and street. Short walk to quaint PG village, restaurants, theater shopping, and Robert Down Elementary school.
    $1,075,000 call Barbara 408-506-5102 to schedule a viewing.

    Move your mouse into a picture to pause the slide show.

    Click the picture for a larger view.